CHR Equipment Ltd delivering profitable solutions to the UK Food Service Industry

Telephone Icon

01772 499774

Why It Matters

At CHR, we’ve been building energy-efficient, sustainable kitchens for more than 15 years — long before it became a buzzword. We didn’t jump on the bandwagon — we built the road.

Since 2010, we’ve committed to phasing out gas from our designs, prioritising induction, connected controls, and data-led planning. Every stove we build includes in-built energy monitoring — and now these systems can be fully connected for real-time tracking and optimisation. With over 100 Ecochef projects completed, our approach isn’t theoretical — it’s proven.

This project at The Dawnay Arms is a perfect example: real savings, better performance, and a kitchen team that’s genuinely happier day to day.

Many kitchens we visit use the wrong kit for how they actually operate.

Traditional gas suites are built for all-day heat. But most modern kitchens have peaks and off-peak periods — and that mismatch leads to wasted energy, overheated spaces, and worn-out teams.

Ecochef solves that — high performance when needed, and always off when you don’t.

The Dawnay Arms project won a CEDA Grand Prix Award – Best Small Project, but for CHR, this is just another day’s work. We’ve done this 100+ times. It’s not standout — it’s our standard.

Top